Backend: - fix 17 missing 'await' in git route handlers causing silent no-ops (branches, diff, history, commit, push, pull, merge, promote, sync) - fix async coroutine passed to run_blocking in git_plugin.py Frontend: - add collapsible 'How it works' onboarding (GitHelpPanel) - add status legend with color-coded repository statuses - i18n: add 50+ missing keys, replace hardcoded strings - add Refresh button in modal header - add PROD deploy confirmation dialog (replaces browser prompt()) - add CommitHistory to workspace tab with timeline nodes - add post-commit success banner with next-step guidance - increase success toast duration to 8s - group local/remote branches in selector (optgroup) - format last_modified dates timezone-aware - change PROD badge from red to neutral indigo - extract shared resolveGitStatusToken to git-utils.ts - fix 'slug' label regression - remove dead init_repo_button key UI/UX audit fixes: - add descriptions to Create/Init buttons in init panel - add actionable CTA to server mismatch warning - improve checkbox text phrasing
2.0 KiB
2.0 KiB
Specification Quality Checklist: Git Integration Plugin for Dashboard Development
Purpose: Validate specification completeness and quality before proceeding to planning Created: 2026-01-18 Last Updated: 2026-07-01 Feature: spec.md
Content Quality
- No implementation details (languages, frameworks, APIs)
- Focused on user value and business needs
- Written for non-technical stakeholders
- All mandatory sections completed
Requirement Completeness
- No [NEEDS CLARIFICATION] markers remain
- Requirements are testable and unambiguous
- Success criteria are measurable
- Success criteria are technology-agnostic (no implementation details)
- All acceptance scenarios are defined
- Edge cases are identified
- Scope is clearly bounded
- Dependencies and assumptions identified
Feature Readiness
- All functional requirements have clear acceptance criteria
- User scenarios cover primary flows
- Feature meets measurable outcomes defined in Success Criteria
- No implementation details leak into specification
2026-07-01 Revalidation Notes
- Phase 12 branch naming migration verified against live backend/frontend implementation
- New repositories verified to use
prodas production branch - Existing
main/masterrepositories verified as legacy-compatible /gitReleasePanel verified to showDEV (dev) -> PREPROD (preprod) -> PROD (prod)- Branch selector verified to group branches by Environment / Feature / Hotfix / Legacy or Advanced
- BI developer UX plan accepted and converted into implementation tasks
- Modal-scoped Git error recovery verified for checkout, pull, push, and unfinished merge failures
Notes
⚠️ VALIDATION UPDATED: Original specification quality passed on 2026-01-18. A 2026-07-01 audit found implementation drift around main vs prod and identified BI-oriented UX improvements. The spec is current, but implementation readiness depends on completing Phase 12A and revalidating the unchecked items above.